ABOUT PTTEP
SUSTAINABILITY
Sustainability at PTTEP >
Chairman and CEO Message
Sustainability Framework and Long-term Target
Sustainability Policy and Guidelines
Sustainability Governance Structure
Governance for Sustainable Business >
Human Resource Management
Supply Chain Management
Technology and Knowledge Management
Transformation
Corporate Governance and Business Ethics
Risk and Crisis Management
Internal Control and Compliance
Cybersecurity
Tax Strategy and Payment Transparency
Environmental Stewardship >
Environmental Management
Climate Change Management
Biodiversity and Ecosystem Services Management
Spill Management
Waste Management
Water Resources Management
Social Value Creation >
Safety, Security, Health and Environment
Human Rights
Stakeholder Management
Social Development
SEARCH
SEARCH
QUICK SEARCH
News & Media
News and Announcement
PTTEP achieves first gas from Block H offshore Malaysia
16 Feb 2021
Bangkok February 16, 2021 – PTT Exploration and Production Public Company Limited (PTTEP), announced the start-up of natural gas production from Rotan and Buluh deepwater fields of Block H Production Sharing Contract (“PSC”) off the coast of Sabah, offshore Malaysia. These fields are located in water depth of greater than 1100 meters. The project will increase domestic energy supply and add sales volume for PTTEP as planned.
Mr. Phongsthorn Thavisin, PTTEP Chief Executive Officer, said PTTEP Sabah Oil Limited, a subsidiary of PTTEP, had completed the first phase of the Block H Project development and commenced natural gas production from the Rotan and Buluh fields for delivery to PETRONAS Floating Liquefied Natural Gas 2 (PFLNG2) facility on February 6, 2021. The project targets production capacity at 270 million standard cubic feet per day (MMSCFD).
“The achievement of first gas from Block H will increase the domestic LNG production capacity and strengthen PTTEP investment portfolio in Malaysia. This start-up also reflects a strong collaboration between PTTEP and joint venture partners together with PETRONAS in bringing together expertise and technologies to reach this milestone,” said PTTEP’s CEO.
The PSC is operated by PTTEP Sabah Oil Limited with 56 percent interest in the Rotan field and 42 percent interest in the remaining area. The joint venture partners are PETRONAS Carigali Sdn. Bhd. and PT Pertamina Malaysia Eksplorasi Produksi.
Apart from Block H, PTTEP’s portfolio in Malaysia comprises Block K, SK 309 and SK 311, and the Malaysia–Thailand Joint Development Area (MTJDA) which are producing projects; and SK 417, SK 314A, SK 438, SK 405B, SK 410B, PM 407 and PM 415 which are exploration projects. PTTEP through PTT Global LNG Company also holds a 10% equity in LNG Train 9 as part of the larger Malaysia LNG Complex in Bintulu.
Mr. Phongsthorn Thavisin, PTTEP Chief Executive Officer, said PTTEP Sabah Oil Limited, a subsidiary of PTTEP, had completed the first phase of the Block H Project development and commenced natural gas production from the Rotan and Buluh fields for delivery to PETRONAS Floating Liquefied Natural Gas 2 (PFLNG2) facility on February 6, 2021. The project targets production capacity at 270 million standard cubic feet per day (MMSCFD).
“The achievement of first gas from Block H will increase the domestic LNG production capacity and strengthen PTTEP investment portfolio in Malaysia. This start-up also reflects a strong collaboration between PTTEP and joint venture partners together with PETRONAS in bringing together expertise and technologies to reach this milestone,” said PTTEP’s CEO.
The PSC is operated by PTTEP Sabah Oil Limited with 56 percent interest in the Rotan field and 42 percent interest in the remaining area. The joint venture partners are PETRONAS Carigali Sdn. Bhd. and PT Pertamina Malaysia Eksplorasi Produksi.
Apart from Block H, PTTEP’s portfolio in Malaysia comprises Block K, SK 309 and SK 311, and the Malaysia–Thailand Joint Development Area (MTJDA) which are producing projects; and SK 417, SK 314A, SK 438, SK 405B, SK 410B, PM 407 and PM 415 which are exploration projects. PTTEP through PTT Global LNG Company also holds a 10% equity in LNG Train 9 as part of the larger Malaysia LNG Complex in Bintulu.
PTT Exploration and Production Public Company Limited
555/1 Energy Complex Building A, Floors 19-36th
Vibhavadi-Rangsit Rd., Chatuchak, Chatuchak, Bangkok 10900
Vibhavadi-Rangsit Rd., Chatuchak, Chatuchak, Bangkok 10900
Phone : 66 (0) 2537-4000
Fax : 66 (0) 2537-4444
This website is best viewed with Chrome, Firefox, Safari and Microsoft Edge.
Copyright © PTT Exploration and Production Plc. All Rights Reserved.
Copyright © PTT Exploration and Production Plc. All Rights Reserved.